Mayo, Yukon
The Mayo B hydro project involved building a new powerhouse 3.7 kilometres downstream from the existing hydro plant (Mayo A). This increased capacity to generate additional renewable energy at the existing site from five megawatts to 15 megawatts, without the need for a new dam or reservoir.